BT Construction Logo General Contractors Committed to Excellence

Tunnels, Bores, and Directional Drilling

BT Construction - Trenchless technology has moved to the forefront of utility installation

Auger bores, Tunnel Boring Machines (TBM), Microtunnel, and Horizontal Directional Drilling (HDD) capabilities have helped eliminate obstacles that could otherwise impact a project. Additionally, the low impact installation is often attractive to owners and engineers, minimizing the inherent economic and social cost of complex construction environments. This work is handled by BTrenchless, a Division of BTC. 

Our services include:

Auger Bores up to 72" in diameter 
TBM from 51" to 130" in diameter 
Microtunnels from 48" to 120" in diameter 
Pipe-jacking up to 120" in diameter 
HDD from 2" to 36" in diameter 

Buck Bergstrom (President of BTC) standing next to an 84" Microtunnel after completing a 364 LF long bore under I-270. Stapleton Development in Denver, Colorado.

Horizontal Directional Drilling at the Denver University Campus, in front of the Ritchie Center.

Inside a 250 LF 90 inch Tunnel Boring Machine under Hwy 85, and the Union Pacific Railroad in Highlands Ranch, Colorado.

BT Construction, Inc. | 9885 Emporia Street, Henderson, CO 80640 | (303) 469 0199