DIA Parking Structure Mod 4

BTC in partnership with FCI Constructors, installed approximately 4,000 LF of RCP storm sewer (18" to 42"), 4,000 LF of (6" to 16") steel waterline and 1,000 LF of 8" sanitary sewer at DIA. The project allowed DIA to alleviate a parking shortage through the introduction of a new parking structure.

Installing 42" RCP in excavations 25' deep through the T-1 Road.

Working on the steel pipeline for the new parking structure for DIA.

Getting ready to install a manhole for the 42" RCP.