City of Broomfield

The City and County of Broomfield, Colorado has contracted BTC to install approximately 21,080 LF 24" to 4" PVC pipe open-cut through tight streets, 12,000 LF of PVC open cut, 6,000 LF of Horizontal Directional Drilling, and 2,500 LF of Fusible Horizontal Direction Drilled pipeline over the past three years . This project will assist Broomfield in meeting their city's needs for current and future water use, including non-potable water.

24" fusible C-900 pipeline being fed into the fusing machine before being directional drilled.

Installing waterline throughout the city streets of Broomfield using the open-cut method.

BT Construction, Inc. | 9885 Emporia Street, Henderson, CO 80640 | (303) 469 0199